:00Thu 24 Sep
Material planning
Orders and parts that will run short. Forecast only: nothing is reserved or lit.
Out of date · from 14:27
Later · not in R1Neo 0045 §2
Material planning: a shortage forecast, what runs out when, the 24 h orders ahead and a planner's levers.
- Not in R1
- Neo R1 has no forecasting: a demand line allocates what exists and closes the rest short; a minimum-stock alert and a replenishment suggestion are all R1 plans with (0045 §2, 0046 §2–3).
- R1 instead
- Replenishment: orders for a line buffer, started by a person or a DP18 suggestion they accept, pulled at the rack. Open Demand
1 is yours
MES part PN-CUST-441 is not linked to a Janus part
Orders using it can't reserve reels · open 4 h 17 min · High in the Review queue
Out of date · from 14:27. Loading failed.
Coverage below is from 14:27. Reload.
Since 18:00 yesterday
- WO-260714-07 became short: item 4, 120 pcs of PN-QFN32-MCU7.
- SR-02 tier 3 stopped reporting. 310 pcs of PN-QFN32-MCU7 and WO-260714-09 items 4 and 5 are Unknown.
- WO-260714-09 became short: item 3, 480 pcs of PN-SMAJ24A.
- REQ-0113 waits for stock. R-2026-0109 waits for its sensor at SR-01-T4-L31 since 14:20.
Orders ahead · next 24 h
WO-260714-07Drive controller DC-24 · SMT Line 2
11:30 · 3 h 2 min late
7 items: 3 taken out, 1 partly, 1 short, 2 reserved.
Item 4 · 120 shortas of 14:27 · 1 decision covers it
Item 4 · PN-QFN32-MCU7 · needs 600 · 120 short
- 480 Reserved · R-2026-0164 · SR-01-T4-L12
- 600 Waiting for review · R-2026-0121 · not put in yet · Review R-2026-0121
- 310 Unknown · R-2026-0131 · SR-02 board 5 · Troubleshoot SR-02
- 350 Quarantine · R-2026-0066 · bake needed
1 decision covers it: Bence Tóth reviews R-2026-0121. Fixing SR-02 board 5 would also cover it: 310 pcs become known.
WO-260714-09Power stage PS-12 · SMT Line 1
16:00
5 items: 2 taken out, 1 short, 2 Unknown.
Item 3 · 120 shortas of 14:27 · items 4–5 Unknown
Item 3 · PN-SMAJ24A · needs 900 · 120 short
- 420 Taken out · SMT Line 1
- 360 Reserved · R-2026-0103 · SR-01-T1-L20
- 120 Available · R-2026-0019 · SR-03-T2-L04
- 2 500 Being put in · R-2026-0109 · waiting for its sensor at SR-01-T4-L31 · Finish the put-in
- 1 000 On the way · R-2026-0137 · at the wrong buffer · Open replenishment orders
- 250 Quarantine · R-2026-0127 · bake needed
1 step covers it: the sensor at SR-01-T4-L31 confirms R-2026-0109. Márta Kovács has waited since 14:20.
Items 4 and 5 · reserved on SR-02 tier 3 · Unknown since 09:41
- 1 000 Unknown · SR-02 tier 3 · board 5 not reporting · Troubleshoot SR-02
Fixing SR-02 board 5 unlocks: items 4 and 5 of this order, and 310 pcs of PN-QFN32-MCU7 — with R-2026-0164, enough for WO-260714-07 line 4. Bence Tóth is fixing it.
WO-260714-11Feeder gateway FG-2 · SMT Line 2
21:00
Coverage not checkedas of 14:27 · no reels reserved
Check only. Nothing is reserved or lit.
WO-260714-10Sensor hub SH-3 · SMT Line 2 · paused
Thu 08:00
All 4 reservedas of 14:27 · paused 12:10
- Taken out
- Reserved
- Covered by stock, not reserved
- Short
- Unknown
- Not checked
- Due
- Nobody on duty