Material planning

Orders and parts that will run short. Forecast only: nothing is reserved or lit.

Updated 14 s ago · every 30 s
Later · not in R1Neo 0045 §2

Material planning: a shortage forecast, what runs out when, the 24 h orders ahead and a planner's levers.

Not in R1
Neo R1 has no forecasting: a demand line allocates what exists and closes the rest short; a minimum-stock alert and a replenishment suggestion are all R1 plans with (0045 §2, 0046 §2–3).
R1 instead
Replenishment: orders for a line buffer, started by a person or a DP18 suggestion they accept, pulled at the rack. Open Demand

1 is yours

MES part PN-CUST-441 is not linked to a Janus part

Orders using it can't reserve reels · open 4 h 17 min · High in the Review queue

All watch lists

Risk for each part in each watch list
PartSMT Line 2line · whole lineSMT Line 1line · whole lineAll racks in servicestock · SR-01, SR-02, SR-03
PN-0603-10K10 kΩ 1 % 0603Replenish nowLate · act now · 8 minNot watchedNo shortage expected43 380 available · min 3 600
PN-0402-100N100 nF 50 V 0402Plan replenishmentact by 14:49Not watchedUnknown14 400 available · no usage rate set · 3 000 Unknown
PN-SMAJ24A24 V TVS · MSL 2aNot watchedBelow minimum60 at the line · refill at 200 · runs out ≈ 14:37Below minimum120 available · min 600 · 2 500 being put in
PN-QFN32-MCU7MCU QFN-32 · MSL 3Unknowncollecting readings · 1 of 2No shortage expected96 pcs · next 8 hBelow minimum0 available · min 600 · 310 Unknown
PN-SOT23-2N7002N-MOSFET 60 VNot watchedUnknownlast report 13:58 · out of dateNo shortage expected5 400 available · min 900

Watch lists overlap. Don't add their numbers.

One watch list

Watch list
  • Above minimum
  • Below minimum
  • Runs out
  • Time to get a new reel + safety margin
Soonest first
  • PN-0603-10K
    10 kΩ 1 % 0603Replenish now
    Act by
    14:24
    Late · act now · 8 min
    REQ-0116 · reel lit
    How this is worked out
    Now
    640 pcs · reported 14:32 by MES adapter
    Refill at the line
    300 pcs
    Method
    Going down ≈ 36 pcs/min (the reported total falls; not proof it was used)
    Time to get a new reel running
    12 min · safety margin 5 min · looks ahead 30 min
    Act by
    14:24 = minimum at 14:41 − 17 min
    Left at the end
    −440 pcs · needed but missing, not negative stock
  • PN-0402-100N
    100 nF 50 V 0402Plan replenishment
    Act by
    14:49
    How this is worked out
    Now
    3 200 pcs · reported 14:32 by MES adapter
    Refill at the line
    800 pcs
    Method
    Going down ≈ 70 pcs/min
    Not counted
    REQ-0115 on the way — reels on the way never hide a shortage
  • PN-QFN32-MCU7
    MCU QFN-32 · MSL 3Unknown

    Not enough readings since 14:10 · 1 of 2. Last reported 180 pcs.

    Act by
    —
    not estimated
How to read this

Each row shows stock going down at the rate seen so far, with no new reels.

Reels on the way are not counted.

For a whole line, the feeder that stops first is not known.

Technical details
Data from
14:32:05 · setup version 7 · stock version 412
Source
MES adapter · vendor-line-A
Watching since
13:02 · line setup entered by an operator, not reported by the machine

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

Material planning

Preview stateUp to date

View as

This page

Purpose
Shortage forecast and the orders ahead.
Release
Later · not in R1 Neo 0045 §2
First viewport
1 primary · 1 notice · 3 blocks