:00Thu 24 Sep

Material planning

Orders and parts that will run short. Forecast only: nothing is reserved or lit.

Updated 14 s ago · every 30 s
Later · not in R1Neo 0045 §2

Material planning: a shortage forecast, what runs out when, the 24 h orders ahead and a planner's levers.

Not in R1
Neo R1 has no forecasting: a demand line allocates what exists and closes the rest short; a minimum-stock alert and a replenishment suggestion are all R1 plans with (0045 §2, 0046 §2–3).
R1 instead
Replenishment: orders for a line buffer, started by a person or a DP18 suggestion they accept, pulled at the rack. Open Demand

1 is yours

MES part PN-CUST-441 is not linked to a Janus part

Orders using it can't reserve reels · open 4 h 17 min · High in the Review queue

Places

  • Line 2 sitesite
    • SMT hallarea
      • SMT Line 1line
        • Line 1 bufferline buffer
        • Line-side rack CrackSR-03
      • SMT Line 2line
        • Line 2 bufferline buffer
        • Reel rack ArackSR-01
        • High-capacity rack BrackSR-02
    • Storesarea
      • Store Astore
      • Stencil roomstore
        • Stencil towerrackST-01
      • Goods-in dockstore

Watch lists

Watch lists and their sources
Watch listSourcePartsStatus
SMT Line 2SMT Line 2 · whole lineMES adaptervendor-line-A3Watchingsince 13:02
SMT Line 1SMT Line 1 · whole lineMES adaptervendor-line-B3Watchingsince 06:00
All racks in serviceSR-01, SR-02, SR-03Stock on record · available5LimitedSR-02 tier 3

2 changes to PN-0603-10K on SMT Line 2Minimum 300 → 400 pcsTime to get a new reel running 12 → 14 min

Discard draft

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Stop watching PN-0603-10K on SMT Line 2?

SMT Line 2 shows Unknown for this part until it has 2 new readings.

Prototype

Material planning

Preview stateDraft

View as

This page

Purpose
Shortage forecast and the orders ahead.
Release
Later · not in R1 Neo 0045 §2
First viewport
1 primary · 1 notice · 3 blocks