:00Thu 24 Sep

Material planning

Orders and parts that will run short. Forecast only: nothing is reserved or lit.

Updated 14 s ago · every 30 s
Later · not in R1Neo 0045 §2

Material planning: a shortage forecast, what runs out when, the 24 h orders ahead and a planner's levers.

Not in R1
Neo R1 has no forecasting: a demand line allocates what exists and closes the rest short; a minimum-stock alert and a replenishment suggestion are all R1 plans with (0045 §2, 0046 §2–3).
R1 instead
Replenishment: orders for a line buffer, started by a person or a DP18 suggestion they accept, pulled at the rack. Open Demand

1 is yours

MES part PN-CUST-441 is not linked to a Janus part

Orders using it can't reserve reels · open 4 h 17 min · High in the Review queue

Risk words

Risk words and what to do
WordMeansWhat to do
Replenish nowIt will run short before a new reel can arrive.Send a reel now.
Plan replenishmentIt will hit the minimum soon, but there is time.Act by the time shown.
Below minimumBelow the minimum now.Replace now; check why.
No shortage expectedNo shortage expected within the look-ahead period.No action needed.
UnknownNo estimate is possible; the reason is always shown. Never shown as zero.Fix the reason.

Report age is shown separately: “12 s ago”, “Out of date · since 13:58” or “Never reported”.

Terms

Watch list
Places Janus watches together, with the parts it expects there. A line watch list covers a line; a storage watch list covers racks.
Line buffer
Where a delivered reel is scanned in at the line.
Look ahead
How far ahead the estimate looks. Up to 7 days.
Time to get a new reel running
Taking the reel out, bringing it, scanning it in and setting it up.
Safety margin
Extra time added before the minimum.
Act by
The latest time to send a new reel so it runs before stock reaches the minimum. After it: Late · act now.
Covered by
Where a short item’s pcs can come from, in the order they can be used.
Check coverage
Works out coverage from current stock. Nothing is reserved or lit.
Going down
The reported total is falling. Not proof it was used — unloading and missed refills look the same.
Usage rate
A rate someone enters for a storage watch list. Never estimated from history.
Collecting readings
After the line setup changes, 2 new readings are needed before estimating.
Suggested reel
The reel that would be taken now. Not reserved; checked again when the take-out starts.
Offer
One reel lit — blinking blue — for someone to take, for a limited time. “Stop offering” turns it off.
Arrived
The reel was scanned at the buffer. Not loaded, not used.

Display language

Planning uses the station language: English, Magyar or Українська. An open draft is kept when you switch.

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Handled by the site administrator.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

Material planning

View as

This page

Purpose
Shortage forecast and the orders ahead.
Release
Later · not in R1 Neo 0045 §2
First viewport
1 primary · 1 notice · 3 blocks