:00Thu 24 Sep

Material planning

Orders and parts that will run short. Forecast only: nothing is reserved or lit.

Updated 14 s ago · every 30 s
Later · not in R1Neo 0045 §2

Material planning: a shortage forecast, what runs out when, the 24 h orders ahead and a planner's levers.

Not in R1
Neo R1 has no forecasting: a demand line allocates what exists and closes the rest short; a minimum-stock alert and a replenishment suggestion are all R1 plans with (0045 §2, 0046 §2–3).
R1 instead
Replenishment: orders for a line buffer, started by a person or a DP18 suggestion they accept, pulled at the rack. Open Demand

1 is yours

MES part PN-CUST-441 is not linked to a Janus part

Orders using it can't reserve reels · open 4 h 17 min · High in the Review queue

Places

  • Line 2 sitesite
    • SMT hallarea
      • SMT Line 1line
        • Line 1 bufferline buffer
        • Line-side rack CrackSR-03
      • SMT Line 2line
        • Line 2 bufferline buffer
        • Reel rack ArackSR-01
        • High-capacity rack BrackSR-02
    • Storesarea
      • Store Astore
      • Stencil roomstore
        • Stencil towerrackST-01
      • Goods-in dockstore

Watch lists

Watch lists and their sources
Watch listSourcePartsStatus
SMT Line 2SMT Line 2 · whole lineMES adaptervendor-line-A3Watchingsince 13:02
SMT Line 1SMT Line 1 · whole lineMES adaptervendor-line-B3Watchingsince 06:00
All racks in serviceSR-01, SR-02, SR-03Stock on record · available5LimitedSR-02 tier 3

2 changes to PN-0603-10K on SMT Line 2Minimum 300 → 400 pcsTime to get a new reel running 12 → 14 min

Discard draft

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Handled by the site administrator.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Stop watching PN-0603-10K on SMT Line 2?

SMT Line 2 shows Unknown for this part until it has 2 new readings.

Prototype

Material planning

Preview stateDraft

View as

This page

Purpose
Shortage forecast and the orders ahead.
Release
Later · not in R1 Neo 0045 §2
First viewport
1 primary · 1 notice · 3 blocks