:00Thu 24 Sep
Put reels in
How a put-in works
Scan the reel, then push it into any empty bay. Nothing is lit: the sensor says where it went, and Janus records it there.
Scanner ready
- Scanned, done14:32
- Recognised, doneFrom label
- Any free bay, done14:32 · green
- Sensor didn't see it, needs review, sensor-confirmedNot confirmed · 8 s
- Stored, not yet
Step 4 of 5 · Sensor didn't see it · Not confirmed · 8 s · needs review
What the steps mean
A square step is recorded by Janus. A round step is confirmed by the rack’s sensor at the bay.
Not confirmed
The sensor didn't see the reel.
Safe: nothing was recorded. Leave R-2026-0042 in T3-L14.
Then: T3-L14 blinks green again and the sensor watches for 8 s.
Then: the put-in stays open at any station, first in Not finished. The bay keeps blinking green.
Then: a supervisor checks the bay and decides. Bence Tóth is on shift.
SR-01 · Reel rack A
SMT Line 2 · position 1 · 42 empty bays
Tier 3 · bays 9–20front view
L14 · lit
- Bay light
- Green blinking · put a reel in here. Green · blinking — put the reel in here
- Sensor at L14
- Empty · not seen in 8 s
- Fits
- 7″ reel · 8 mm tape · 1 bay
- Tower lights
- Yellow tower · attention on this rack. Left yellow · Off · nothing to do here. Right off
Not finished
1 put-in not finished
- R-2026-0109 · PN-SMAJ24A2 500 pcs from label · The sensor did not see it at SR-01-T4-L31 · covers WO-260714-09's 480 pcs shortYou12 min ago
3 more in the Review queue
- R-2026-0118 · PN-0402-100N4 000 pcs · default quantity · Started at Station SMT-1, not finishedGábor NagyOperator · 1 h 4 min ago
- R-2026-0121 · PN-QFN32-MCU7600 pcs from MES · Sent by MES, waiting for reviewMES adapterConnected system · 2 h ago
- R-2025-0913 · PN-0603-10KQuantity unknown · no scan or sensor has seen this reelOld record · before Janus