:00Thu 24 Sep
Put reels in
How a put-in works
Scan the reel, then push it into any empty bay. Nothing is lit: the sensor says where it went, and Janus records it there.
Scanner ready
- Scanned, done14:32
- Recognised, doneFrom label
- Two bays lit, nowfirst change wins
- Sensor saw it, not yet, sensor-confirmed
- Stored, not yet
Step 3 of 5 · Two bays lit · first change wins
What the steps mean
A square step is recorded by Janus. A round step is confirmed by the rack’s sensor at the bay.
Put in, or take out. Not both.
Safe: do only one. The first change the sensor sees is recorded; the other request goes back to its list.
A take-out is waiting on SR-01 · SMT Line 2 · position 1 too.
Green blinking · put a reel in here.Put in · green blinking
T3-L14
Put R-2026-0042 into the green bay.
Blue blinking · take this reel out.Take out · blue blinking
T2-L07
Take R-2026-0011 out of the blue bay.
If you take out first, scan R-2026-0042 again afterwards to put it in.
SR-01 · Reel rack A
SMT Line 2 · position 1 · 42 empty bays
Tier 3 · bays 9–20front view
L14 · lit
- Bay light
- Green blinking · put a reel in here. Green · blinking — put the reel in here
Blue blinking · take this reel out. Blue · blinking at T2-L07 — take this reel out - Sensor at L14
- Empty
- Fits
- 7″ reel · 8 mm tape · 1 bay
- Tower lights
- Yellow tower · attention on this rack. Left yellow · Off · nothing to do here. Right off
Not finished
1 put-in not finished
- R-2026-0109 · PN-SMAJ24A2 500 pcs from label · The sensor did not see it at SR-01-T4-L31 · covers WO-260714-09's 480 pcs shortYou12 min ago
3 more in the Review queue
- R-2026-0118 · PN-0402-100N4 000 pcs · default quantity · Started at Station SMT-1, not finishedGábor NagyOperator · 1 h 4 min ago
- R-2026-0121 · PN-QFN32-MCU7600 pcs from MES · Sent by MES, waiting for reviewMES adapterConnected system · 2 h ago
- R-2025-0913 · PN-0603-10KQuantity unknown · no scan or sensor has seen this reelOld record · before Janus