:00Thu 24 Sep

Floor

About the Floor

Yours now is the work that waits for you, in the order it is needed. Ready lists collections waiting in your rack's Ready list; they light when the station there pulls them: Next, a list scan or Start.

As of 14:29 · 3 yours · 5 of 12 in Review at this line

Yours now

  1. Readyat SR-01 · lights on pull
    Continue WO-260714-07
    3 reels for SMT Line 2 · due 11:30
  2. Not finishedWaiting for its sensor at T4-L31
    Finish putting in R-2026-0109
    2 500 pcs of PN-SMAJ24A · waiting for its sensor at SR-01-T4-L31
  3. Due backsince 13:48
    Bring back R-2026-0057 from feeder 14
    1 800 pcs expected of PN-0603-10K · due back since 13:48. Count what is left when it comes back.

Ready at SR-01

Your rack

The rack drawing

  • Occupied
  • Reserved
  • Lit
  • Unknown · sensor not reporting
  • Presumed · not re-confirmed
  • Taken, awaiting the rack
  • Empty
SR-01 · Reel rack ASMT Line 2 · position 1 · your working rackOnline

SR-02 Limited · SR-03 Online

Others are on it

Show who
  • Bence Tóthsince 14:03
    SR-02 tier 3 stopped reporting · Bays 1–16 Unknown since 09:41: never lit, never read as empty. 1 take-out waiting for the settled read. Latest: 14:18 spare board fitted, answers as board 10, not in wiring yet.
  • Bence TóthShift B supervisor
    WO-260714-09 is 120 pcs short of PN-SMAJ24A · Line 3 closed short 120 pcs at allocation. Accept the shortage or close the order short.
  • Bence Tóthsince 14:03
    COUNT-260714-A · SR-01 tier 5 · 1 difference to post · 1 of 2 differences closed · L30 still to post.
  • No ownerwaits for an owner
    Missing · R-2026-0088 · booked by Janus · Booked at the Missing delay at 13:22: SR-01-T5-L22 read Clear since 12:52 and no task held the reel. Found it, or decide: taken to line, used up, scrap.
  • No ownerwaits for an owner
    Missing · R-2026-0175 · booked by Janus · Booked at the Missing delay at 14:32: SR-01-T2-L10 read Clear since 14:21 and no task held the reel. Found it, or decide: taken to line, used up, scrap.

Open Review queue (12)

8 since 09:41
  1. 14:32
    Reel stored · R-2026-0042 at SR-01-T3-L14
    Márta Kovács · 5 000 pcs · sensor confirmed
  2. 14:31
    Reel stored · R-2026-0164 at SR-01-T4-L12
    Márta Kovács · reserved for WO-260714-07 line 4
  3. 14:20
    Put-in started · R-2026-0109 at SR-01-T4-L31
    Márta Kovács · waiting for the sensor
  4. 13:48
    Reel taken out · R-2026-0057 → SMT Line 2 · feeder 14
    Gábor Nagy · 1 800 pcs due back
  5. 13:05
    Count counted · 2 differences to post · COUNT-260714-A
    Gábor Nagy · SR-01 tier 5 · 30 of 32 bays confirmed
  6. 12:52
    Left its bay without a take-out · SR-01-T5-L22
    R-2026-0088 · sensor at SR-01-T5-L22
  7. 11:02
    Take-out request rejected · R-2026-0103
    MES adapter · reel reserved by another order
  8. 09:41
    Sensors stopped · SR-02 tier 3
    Sensor reader · board 5 did not answer · bays 1–16

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Handled by the site administrator.Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Handled by the site administrator.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

Floor

Preview stateOperator · Márta

View as

This page

Purpose
What is yours now; for a supervisor, the floor board. Ready at the racks, and a rack that is not reporting.
Release
R1
First viewport
1 primary · 1 notice · 3 blocks