:00Thu 24 Sep

Your roles can see, not change

Pages show what is recorded. Ask a site administrator if you need to change something.

Floor

About the Floor

The floor board: the Review queue's top items, the people on the floor, the racks, what is ready for a pull and the devices with a problem. Arrange board changes the order of the lanes for you only.

As of 14:29 · 12 in the Review queue · SR-02 limited

Waiting for a decision

  1. Bays 1–16 Unknown since 09:41: never lit, never read as empty. 1 take-out waiting for the settled read. Latest: 14:18 spare board fitted, answers as board 10, not in wiring yet.
    Bence Tóth · since 14:03
    Critical4 h 51 min
  2. R-2026-0121 (600 pcs) has waited 2 h for review. 1 decision covers it.
    Bence Tóth · Shift B supervisor
    High3 h 2 min
  3. Line 3 closed short 120 pcs at allocation. Accept the shortage or close the order short.
    Bence Tóth · Shift B supervisor
    High2 h 10 min
9 more in the queue · 7 with no owner.Open Review queue (12)

Racks

  • SMT Line 2 · position 1 · at Station SMT-2
    Online1 difference to post on tier 5 · COUNT-260714-A · put-in waits at T4-L31Márta Kovács · Station SMT-2 · seen 14:32
  • SMT Line 2 · position 2 · since Mon 1 Sep
    Limitedtier 3 bays 1–16 Unknown since 09:41 · 1 take-out awaiting SR-02Dávid Horváth · laptop at SR-02 · permit until 18:00
  • SMT Line 1 · position 1 · at Station SMT-1
    OnlineCOUNT-260714-B · tier 1 · checking each reelLászló Varga · PDA-03 · Oleh Bondar · Station SMT-1
  • SMT Line 2 · position 3
    Being set upnot in serviceDávid Horváth · installer

Below minimum · 2

PN-SMAJ24A 480 of 600 pcs in the racks · 120 available
PN-QFN32-MCU7 480 of 600 pcs in the racks · 0 available

Ready at the racks

  • WO-260714-07 → SMT Line 2
    SR-01 · T4-L12, T1-L25, T2-L28
    due 11:30
    Late
  • WO-260714-09 → SMT Line 1
    SR-01 · T1-L20
    due 16:00
  • REQ-0119 → SMT Line 1 · kitting cart
    SR-02 · T1-L03
    due 15:10
  • WO-260714-07 → SMT Line 2
    SR-03 · T2-L09
    due 11:30
    Late
  • RO-0120 → SMT Line 2 · buffer
    SR-03 · T1-L08
    due 15:00

Devices

  • PDA-03 · handheld · László Varga
    Late since 14:30 · battery · swap it before 15:00
    Details

    Wi-Fi 40 %In a task · COUNT-260714-B · 6 bays leftLast seen at SR-03 · SMT Line 1

    The count continues where it stopped.

  • Stations SMT-1 and SMT-2 · LT-SMT1 · LT-SMT2 · PDA-04

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Márta Kovács is on it.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Help

Your roles read records; they can't call for help or report here. Ask a supervisor.

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

Floor

Preview stateAuditor · Zoltán

View as

This page

Purpose
What is yours now; for a supervisor, the floor board. Ready at the racks, and a rack that is not reporting.
Release
R1
First viewport
1 primary · 1 notice · 3 blocks