:00Thu 24 Sep

WO-260714-07 · Drive controller DC-24

3 of 7 items taken out. One review covers item 4.

Later · not in R1Neo 0046 §3, 0055 §31

The old order board: a shortage waits for stock ("what still covers it"), the order pauses, re-plans with current stock and is completed short in one act.

Not in R1
R1 has no queue waiting for stock and no re-plan: a line allocates what exists and closes the rest short at once, and Closed short is terminal (demand digest rules 3, 6–7).
R1 instead
The R1 order: its lines, what each got, and the Closed short end-stop; a supervisor may close it short. Open it
State
In progresssince 13:40 · started by Gábor Nagy (Shift A)
Due
Today 11:303 h 2 min late · Expedite
Owner
Márta KovácsStation SMT-2 · since 14:00Handed over with the station at 14:00. Anyone on the shift can continue.
Line · customer
SMT Line 2Internal assembly

Item 4 is 120 pcs short

  • 480 Reserved · R-2026-0164 · SR-01-T4-L12
  • 600 Waiting for review · R-2026-0121 · not put in yet · Review R-2026-0121
  • 310 Unknown · R-2026-0131 · SR-02 board 5 · Troubleshoot SR-02
  • 350 Quarantine · R-2026-0066 · bake needed

1 decision covers it: a supervisor reviews R-2026-0121, waiting since 12:30 (Bence Tóth is on shift). Fixing SR-02 board 5 also covers it: 310 pcs become known.

Where the remaining reels are

  • SR-01-T2-L28
    R-2026-0012 · item 1 · takes 4 000 of 4 820 pcs · 820 pcs come back
    RecordReserved 06:10 · in this baySensorReel in the bay · 14:32
    Next
  • SR-01-T4-L12
    R-2026-0164 · item 4 · takes all 480 pcs
    RecordStored 14:31 · reserved for item 4SensorReel in the bay · 14:32
    Reserved
  • SR-01-T1-L25
    R-2026-0145 · item 6 · takes 900 of 3 000 pcs
    RecordReserved 06:10 · in this baySensorReel in the bay · 14:32
    Reserved
  • SR-03-T2-L09
    R-2026-0140 · item 7 · takes 2 400 of 5 000 pcs
    RecordReserved 06:10 · in this baySensorReel in the bay · 14:32
    Reserved
SR-01 · Reel rack A · SMT Line 2 · position 1
SR-03 · Line-side rack C · SMT Line 1 · position 1
  • Reserved for this order
  • Other stock
Items taken out
3of 7
1 partly, 1 short
Pcs taken out
9 200
of 17 100 pcs · sensor confirmed
Reels taken out
4
1 due back · 1 put back · 2 used up

Items

Items, part by part
ItemPartRequiredTaken outReelsState
1PN-0603-10K10 kΩ 1 % 0603 · Yageo7 2003 200
R-2026-0057 · 3 200 taken outR-2026-0012 · 4 000 next · SR-01-T2-L28In progress
2PN-0402-100N100 nF 50 V 0402 · Murata4 0004 000
R-2026-0026 · 4 000 taken outTaken out
3PN-SOT23-2N7002N-MOSFET 60 V · ESD1 2001 200
R-2026-0102 · 1 200 taken outTaken out
4PN-QFN32-MCU7MCU 120 MHz · MSL 3 · ESD6000
R-2026-0164 · 480 reserved · SR-01-T4-L12120 short · what covers it120 pcs short
5PN-0805-22U22 µF 25 V 0805800800
R-2026-0093 · 800 taken outTaken out
6PN-SOD123-1N4148Switching diode9000
R-2026-0145 · 900 reserved · SR-01-T1-L25Ready
7PN-0603-4K74.7 kΩ 1 % 06032 4000
R-2026-0140 · 2 400 reserved · SR-03-T2-L09Ready

Reels out and their leftovers

Reels out
ReelTaken outLeftoverCame backNow atActions
R-2026-0057item 13 2001 800—Due backSMT Line 2 · feeder 14 · since 13:48Put back in
R-2026-0093item 58001 2001 180difference −20Stored14:05 · Márta Kovács
R-2026-0102item 31 2000—Used upreel emptied at the line
R-2026-0026item 24 0000—Used upreel emptied at the line
  1. 14:31
    Reel reserved for item 4 · R-2026-0164 · 480 pcs
    Reservation rule · stored at SR-01-T4-L12 by Márta Kovács · 120 pcs still short · EV-2492
  2. 14:22
    Reel taken out · R-2026-0026 · 4 000 pcs
    Márta Kovács · item 2 · reel used up · EV-2486
  3. 14:10
    Reel taken out · R-2026-0102 · 1 200 pcs
    Márta Kovács · item 3 · reel used up · EV-2483
  4. 14:05
    Leftover put back · R-2026-0093 · 1 180 of 1 200 pcs
    Márta Kovács at Put in · difference −20 accepted by Bence Tóth · EV-2480
  5. 14:02
    Take-out rejected · wrong reel R-2026-0036 for item 1
    Márta Kovács · nothing moved · EV-2476
  6. 14:00
    Handed over · with Station SMT-2
    Márta Kovács signed in by badge · EV-2474
  7. 13:55
    Reel taken out · R-2026-0093 · 800 pcs
    Gábor Nagy · item 5 · leftover 1 200 pcs due back · EV-2471
  8. 13:48
    Reel taken out · R-2026-0057 · 3 200 pcs
    Gábor Nagy · item 1 · leftover 1 800 pcs due back · EV-2468
  9. 13:40
    Started
    Gábor Nagy · Station SMT-2 · Shift A · EV-2465
  10. 06:10
    Reels reserved · 7 items, 600 pcs of item 4 short
    MES adapter · R-2026-0012 for item 1 among them · EV-2366
  11. Tue
    Added from template · WO-260701-03
    Olena Kovalenko · Tue 23 Sep 16:40

Pause WO-260714-07?

Any lit bay for this order goes dark. Its reserved reels stay reserved.

Shown to whoever continues the order.

Complete WO-260714-07?

Closes the order in the record. No bay lights.

4 things block completing

  • Item 1 is partly taken out.
    4 000 pcs of PN-0603-10K still come from R-2026-0012. Continue at station
  • Item 4 is 120 pcs short.
    R-2026-0121 (600 pcs) has waited for review since 12:30. Review R-2026-0121
  • Items 6 and 7 are not taken out yet.
    Both reels are reserved.
  • R-2026-0057 has 1 800 pcs due back.
    Put it back in, or record it as empty. Put back in
Completing short needs a supervisor. Bence Tóth (Shift B) is on shift.
Unavailable while something blocks completing.

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Handled by the site administrator.Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Handled by the site administrator.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

WO-260714-07 · Work orders

Preview stateWhat still covers it

View as

This page

Purpose
One demand: each line covered, where its reels wait, and Close short.
Release
R1
First viewport
1 primary · 1 notice · 3 blocks