:00Thu 24 Sep

WO-260714-07 · Drive controller DC-24

About this demand

A work order, a replenishment order and a request each create demand. Each line takes the stock there is when it arrives and closes the rest short; stock that arrives later never reopens it.

Nothing on this page lights a bay. At the rack, a take-out fulfils its line when the sensor sees the reel leave; Undo take-out inside its window reopens it.

A supervisor may close the order short: dispatch stops at once, lit reels finish, then it is final.

Due 11:30 · late · created 06:10

In progress

Work order · MES · work-order importSMT Line 2

Requested
13 900 pcs
Allocated
7 780 pcs
Confirmed
6 000 pcs
Short
120 pcs

Lines

WO-260714-07: lines
LineItemRequestedConfirmedState
line 1 PN-0603-10K10 kΩ 1 % 0603 4 000 pcs 0 pcs AllocatedR-2026-0012 · SR-01-T2-L28
line 4 PN-QFN32-MCU7STM32G431KBU6 MCU 600 pcs 0 pcs Short · 120 pcs closedNo other reel of PN-QFN32-MCU7 could be allocated: one waited for review, one was in quarantine
  • 480 Reserved · R-2026-0164 · SR-01-T4-L12
  • 120 Closed short · at allocation
line 6 PN-SOD123-1N41481N4148 diode 900 pcs 0 pcs AllocatedR-2026-0145 · SR-01-T1-L25
line 7 PN-0603-4K74.7 kΩ 0603 2 400 pcs 0 pcs AllocatedR-2026-0140 · SR-03-T2-L09
3 lines fulfilled
WO-260714-07: fulfilled lines
LineItemRequestedConfirmedState
line 2 PN-0402-100N100 nF 50 V 0402 4 000 pcs 4 000 pcs FulfilledTaken out · R-2026-0026
line 3 PN-SOT23-2N7002N-MOSFET 60 V 1 200 pcs 1 200 pcs FulfilledTaken out · R-2026-0102
line 5 PN-0805-22U22 µF 25 V 0805 800 pcs 800 pcs FulfilledTaken out · R-2026-0093

Where its reels are

  • SR-01 · Reel rack A · T2-L28, T4-L12, T1-L25
    In the Ready list at SR-01 · lights when its station pulls them
    Ready
  • SR-03 · Line-side rack C · T2-L09
    In the Ready list at SR-03 · lights when its station pulls them
    Ready

What happened

Show the history
  1. 14:22
    Taken out · R-2026-0026 · line 2
    Márta Kovács · 4 000 pcs · EV-2486
  2. 14:10
    Taken out · R-2026-0102 · line 3
    Márta Kovács · 1 200 pcs · EV-2483
  3. 13:55
    Taken out · R-2026-0093 · line 5
    Gábor Nagy · 1 200 pcs · EV-2471
  4. 06:10
    120 pcs closed short · line 4
    No other reel of PN-QFN32-MCU7 could be allocated: one waited for review, one was in quarantine
  5. 06:10
    Accepted · Work order
    MES · work-order import · lines allocated what existed

Trace pack · WO-260714-07

Its whole life: every entry, the reels it took, the sensor confirmations, with a manifest.

Then: the entries as CSV and a manifest with checksums download to this computer. The export is recorded in Activity under your name.

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Handled by the site administrator.Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Handled by the site administrator.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

WO-260714-07 · Work orders

Preview stateIn progress

View as

This page

Purpose
One demand: each line covered, where its reels wait, and Close short.
Release
R1
First viewport
1 primary · 1 notice · 3 blocks