:00Thu 24 Sep
Close Shift B
Wed 24 Sep · 14:00–22:00 · 7 h 28 min left. Shift A reads this first when its supervisor badges in at 06:00.
Later · not in R1Neo charter · non-goals
Close shift and Start shift: a supervisor hands the shift’s open work, alerts and on-call over to the next shift, which takes it over.
- Not in R1
- Neo decides no shift model and builds nothing without a client, contract or site need; the owner took shifts and their handover out of R1.
- R1 instead
- Open work stays on the Review queue and the Floor with its owner; a person signing out hands on what is open under their name. Open Review queue
Closed by Katalin Horváth · Shift A · 13:58Taken over by you · 14:03
3 items carried over · 1 still open: R-2026-0149 owed back
Katalin's note
SR-02 board 5 still silent; Dávid is fitting a spare. R-2026-0149 not back from Line 1 feeder 6 yet. ST-01 stays with me until the vendor calls back.
Decided this shift 4receipts, in order
- 14:05Leftover difference accepted · R-2026-0093 −20 pcs“Feeder splice loss, within tolerance.”
- 14:05Troubleshooting opened · SR-02Nothing changed on the rack.
- 14:10Replenishment requested · REQ-0113PN-SMAJ24A → SMT Line 1 buffer · waiting for goods-in
- 14:24Quantity corrected · R-2026-0164 · 620 → 480 pcsFrom Márta Kovács's hand count
Still open on the floor 1812 in the Review queue · 1 fault alert · 1 count in progress · 1 permit · 3 owed back
In the Review queue · 12
- 09:41SR-02 tier 3 stopped reportingBays 1–16 Unknown since 09:41: never lit, never read as empty. 1 take-out waiting for the settled read. Latest: 14:18 spare board fitted, answers as board 10, not in wiring yet.Bence Tóth
- 11:30WO-260714-07 is 3 h late · item 4 is 120 pcs shortR-2026-0121 (600 pcs) has waited 2 h for review. 1 decision covers it.Bence Tóth
- 12:22WO-260714-09 is 120 pcs short of PN-SMAJ24ALine 3 closed short 120 pcs at allocation. Accept the shortage or close the order short.Bence Tóth
- 12:52COUNT-260714-A · SR-01 tier 5 · 1 difference to post1 of 2 differences closed · L30 still to postBence Tóth
- 13:22Missing · R-2026-0088 · booked by JanusBooked at the Missing delay at 13:22: SR-01-T5-L22 read Clear since 12:52 and no task held the reel. Found it, or decide: taken to line, used up, scrap.
- 14:32Missing · R-2026-0175 · booked by JanusBooked at the Missing delay at 14:32: SR-01-T2-L10 read Clear since 14:21 and no task held the reel. Found it, or decide: taken to line, used up, scrap.
- 10:15MES part PN-CUST-441 is not linked to a Janus partOrders using it can't reserve reels. Fix the link in MES.Olena Kovalenko
- 14:32PN-SMAJ24A · below its minimumBelow minimum · 480 of 600 pcs
- 14:32PN-QFN32-MCU7 · below its minimumBelow minimum · 480 of 600 pcs
- 13:28Put-in not finished · R-2026-0118Started by Gábor Nagy at Station SMT-1 (Shift A). 4 000 pcs of PN-0402-100N not in stock yet.
- 11:20Würth Elektronik label not recognised3 scans today could not be read.
- —Record, no reel · R-2025-0913An old record that no scan or sensor has seen. Its quantity is Unknown, never counted as 0.
Fault alerts not in the queue · 1
- 07:12ST-01 stencil tower offlineWaiting for the vendor's call-backKatalin HorváthOff shift since 14:00
Counts in progress · 1
- 14:10COUNT-260714-B · SR-03 tier 1 · 10 of 16 readLászló Varga · PDA-03
Owed back · 3 · not part of the 12
- 11:20R-2026-0149 · 2 310 pcs · SMT Line 1 · feeder 6
Over 2 hCarried over from Shift A
- 13:48R-2026-0057 · 1 800 pcs · SMT Line 2 · feeder 14WO-260714-07 line 1 · taken out by Gábor Nagy, Shift A
- 13:58R-2026-0152 · quantity Unknown · SMT Line 1 return cartReported back by MES without a count
Access that ends · 1
- 18:00Dávid Horváth · SR-02 tier 3 bays 1–16Permit from you · ends by itself at 18:00
Racks: none is being moved and every place is confirmed.