:00Thu 24 Sep

Close Shift B

Wed 24 Sep · 14:00–22:00 · 7 h 28 min left. Shift A reads this first when its supervisor badges in at 06:00.

Later · not in R1Neo charter · non-goals

Close shift and Start shift: a supervisor hands the shift’s open work, alerts and on-call over to the next shift, which takes it over.

Not in R1
Neo decides no shift model and builds nothing without a client, contract or site need; the owner took shifts and their handover out of R1.
R1 instead
Open work stays on the Review queue and the Floor with its owner; a person signing out hands on what is open under their name. Open Review queue
Closed by Katalin Horváth · Shift A · 13:58Taken over by you · 14:03 3 items carried over · 1 still open: R-2026-0149 owed back
Katalin's note
SR-02 board 5 still silent; Dávid is fitting a spare. R-2026-0149 not back from Line 1 feeder 6 yet. ST-01 stays with me until the vendor calls back.
Decided this shift 4receipts, in order
  1. 14:05
    Leftover difference accepted · R-2026-0093 −20 pcs
    “Feeder splice loss, within tolerance.”
  2. 14:05
    Troubleshooting opened · SR-02
    Nothing changed on the rack.
  3. 14:10
    Replenishment requested · REQ-0113
    PN-SMAJ24A → SMT Line 1 buffer · waiting for goods-in
  4. 14:24
    Quantity corrected · R-2026-0164 · 620 → 480 pcs
    From Márta Kovács's hand count
Still open on the floor 148 in the Review queue · 1 fault alert · 1 count in progress · 3 owed back · 1 permit
  1. In the Review queue · 8

    Open Review queue (8)
  2. 09:41
    SR-02 tier 3 · bays 1–16 Unknown
    14:18 spare board fitted · answers as board 10 · Dávid Horváth drafts wiring v4
    You
  3. 12:52
    SR-01 tier 5 · 2 bays disagree · COUNT-260714-A
    Nobody at the rack yet
    You · from Katalin Horváth 14:03
  4. 11:30
    WO-260714-07 · 3 h late · item 4 is 120 pcs short
    R-2026-0121 (600 pcs) waits for review · 1 decision covers it
    You
  5. 12:22
    WO-260714-09 · 480 pcs short · due 16:00
    R-2026-0109 waits for its sensor at SR-01-T4-L31 since 14:20
    You
  6. 10:15
    MES part PN-CUST-441 not linked
    Fix the link in MES
    Olena Kovalenko
  7. 13:28
    R-2026-0118 · put-in not finished
    Started by Gábor Nagy at Station SMT-1 · no owner
  8. 11:20
    Würth Elektronik label not recognised
    3 scans today · no owner
  9. —
    R-2025-0913 · record, no reel
    Old record · no scan or sensor has seen it · no owner
  10. Fault alerts not in the queue · 1

  11. 07:12
    ST-01 stencil tower offline
    Waiting for the vendor's call-back
    Katalin HorváthOff shift since 14:00
  12. Counts in progress · 1

  13. 14:10
    COUNT-260714-B · SR-03 tier 1 · 10 of 16 read
    László Varga · PDA-03
  14. Owed back · 3 · not part of the 8

    Owed back in Review
  15. 11:20
    R-2026-0149 · 2 310 pcs · SMT Line 1 · feeder 6

    Over 2 hCarried over from Shift A

  16. 13:48
    R-2026-0057 · 1 800 pcs · SMT Line 2 · feeder 14
    WO-260714-07 line 1 · taken out by Gábor Nagy, Shift A
  17. 13:58
    R-2026-0152 · quantity Unknown · SMT Line 1 return cart
    Reported back by MES without a count
  18. Access that ends · 1

  19. 18:00
    Dávid Horváth · SR-02 tier 3 bays 1–16
    Permit from you · ends by itself at 18:00

Racks: none is being moved and every place is confirmed.

People & devices at close

  • PDA-03 · László Varga · 21 %
    Not docked · late since 14:30 · dock it before you go
    Low
  • PDA-04 · Márta Kovács · 78 %
    Not docked · signed in
    Dock at close
  • Station SMT-1 · Oleh Bondar
    Signed in · SR-03
    Signs out at 22:00
  • Station SMT-2 · Márta Kovács
    Signed in · SR-01
    Signs out at 22:00

4 of 4 on Shift B are signed in now. At close this list shows only what is left.

Before anyone returns

WO-260714-11 · Feeder gateway FG-2 · due 21:00Coverage not checked
Check only. Nothing is reserved or lit.
Runs unattended

Automatic replenishment stays on; offers are lit until taken out. Towers: quiet hours 22:00–06:00, blinks become steady. Nightly backup at 02:00.

22:00–06:00 · nobody on duty

3 alerts are open now: ST-01 offline · SR-02 limited · Counter ReelSave failing.

On call tonight

For example: Eszter Szabó is on leave; agreed with the plant manager.

0 / 500

Shown to Shift A's supervisor at badge sign-in, word for word, with your name.

Handover

Closed by Shift B14:32Bence Tóth · Operator + Supervisor
Taken over by Shift ANot yetKatalin Horváth · at badge sign-in, 06:00

Recorded · Shift B closed

By
Bence Tóth · 14:32
Handed over
4 decisions · 14 open items
On call
Eszter Szabó · SMS · site rule
Reference
HO-260924-B

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Handled by the site administrator.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

Close shift

Preview stateClosed · waiting for Shift A

View as

This page

Purpose
Close a shift and start the next.
Release
Later · not in R1 Neo charter · non-goals
First viewport
1 primary · 1 notice · 3 blocks