:00Thu 24 Sep

Dávid Horváth, Danutek technician account

Always on while R1 is trialled. Every action is logged under this named account; it is not a site user.

SR-05 · Stencil rack E

Draft · paused at Shape · Later, not in R1

SR-05’s setup is kept as it was

Paused at Shape by Dávid Horváth at 13:52. Nothing here moves it on.

Later · not in R1Neo 0032 §24; PRD §1.4

Stencil racks: stencils stored by slot, their tower, and taking a stencil out to a printer

Not in R1
Neo keeps the model shape for stencils but defers their qualification and journeys until after R1: release 1 stores reels only
R1 instead
Reel racks only. Stencils stay where the site keeps them today, outside Janus Open Equipment
Controller
…0344 · 192.168.0.26
Shape
4 tiers × 12 slots · stencils
Where
SMT Line 1 · position 2

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Eszter Szabó is told. Put the reel aside.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Márta Kovács is on it.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Handled by the site administrator.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Stop and keep the draft?

It stays in Rack setup as Setup paused, under your name. Anyone with setup access can continue it. If it is still paused when your service visit ends, Sun 28 Sep 18:00, it passes to Eszter Szabó, who sponsors the visit.

Stop and keep draft

Prototype

SR-05 · Stencil rack E · Rack setup