:00Thu 24 Sep

SR-02 · High-capacity rack B

Dávid Horváth · tier 3, bays 1–16 · until 18:00

Limited · tier 3 bays 1–16 unknown since 09:41 SMT hall › SMT Line 2 · position 2

Technical details
Shape
4 tiers × 32 bays
Controller
CTRL-B01
Address
192.168.0.22
Floor label
POS-L2-02
Permit
PMT-260924-01 · Dávid Horváth · tier 3, bays 1–16
Granted by
Bence Tóth · 14:26 · ends when the fault closes
Viewing · working rack stays SR-01

Reels Janus doesn’t know

Every bay that reads a reel has a record. Tier 3, bays 1–16 can’t be read until board 5 answers.

Tier 3, bays 1–16 are Unknown · board 5 not reporting since 09:41

Unknown until board 5 reports. Put-ins skip these bays; a take-out there needs a scan.

What happened

The other 112 bays work normally; the left tower is yellow for tier 3. Dávid Horváth fitted a spare board at tier 3 at 14:18; it answers as board 10. He drafted wiring version 4 under his permit at 14:30: board 10 takes tier 3, bays 1–16. It waits for a site administrator to apply it.

Bays

T4T3T2T1
  • Occupied
  • Empty
  • Unknown
  • Taken, awaiting the rack
  • Presumed · not re-confirmed
  • Permit · Dávid Horváth · until 18:00
Left tower yellow · Right tower off
Bays as a list
SR-02 bays
BayRecordSensorSize
SR-02-T3-L03R-2026-0132
PN-0402-100N · 3 000 pcs
Unknown · since 09:417″
SR-02-T3-L07R-2026-0131
PN-QFN32-MCU7 · 310 pcs
Unknown · since 09:417″
SR-02-T3-L11R-2026-0134
PN-0603-10K · 2 000 pcs · taken, awaiting SR-02 since 10:12
Unknown · since 09:417″
SR-02-T2-L23R-2026-0160
PN-SOD123-1N4148 · 2 200 pcs
Reel7″

Showing a few of 128. Open Inventory to search and export every bay.

Waiting for the rack

How work goes on while a board is silent

Work goes on while board 5 is silent. A reel on record in these bays is taken out on screen guidance and a scan; nothing is booked until the settled read shows its bay Clear. Put-ins go to bays that report.

When the board reports again, Janus reads every bay of it before any light is set, and compares.

  • R-2026-0134
    Taken, awaiting SR-02 PN-0603-10K · 2 000 pcs
    RecordSR-02-T3-L11 · scanned 10:12 by László Varga · to SMT Line 2SensorWaiting for the settled read

Who may work on this fault

T4T3T2T1
Dávid Horváth · tier 3, bays 1–16 · until 18:00
Permit
PMT-260924-01 · Dávid Horváth
Where
SR-02 tier 3, bays 1–16 · boards 5 and 10
May
Ask boards again · light and check bays · read sensors · draft wiring
Stays with
A site administrator: applying wiring and everything else on SR-02
Ends
18:00, or when the fault closes
Granted
Bence Tóth · fault owner · 14:26

Done under this permit

  1. 14:30
    Wiring version 4 drafted · board 10 → tier 3, bays 1–16
    waiting to be applied
  2. 14:30
    T3-L07 checked through board 10 · lit blue
    seen on his phone
  3. 14:27
    Board 5 asked again · no answer
Review wiring version 4

Connection path

  1. Janus serverjanus-smt-line2Running
  2. Rack networken5 · approved Mon 18 AugOnline
  3. Controller CTRL-B01192.168.0.22:502Online since 06:02 · 26 ms
  4. RS-485 bus 17 of 8 bay boards answerBoard 5 · no answerCheck board 5 in Wiring
  5. Sensors112 of 128 reportingTier 3 · 1–16 unknown

Identify

T4T3T2T1

Tiers light amber in turn, then the rack flashes twice. 3 s.

Tower lights

Tower rules · the first match wins on each tower

Which readings count

When a reading counts

A reading counts only when the board answered, in the current connection, and newer than the last one Janus used. The controller saying “received” is not a reading.

SR-02 readings per board
Part of tierBoardReadingLast good readingCounts
Tier 1 · 1–32boards 1, 2OK0.4 s agoYes
Tier 2 · 1–32boards 3, 4OK0.2 s agoYes
Tier 3 · 1–16board 5No answer09:41 · 4 h 51 min agoNo — Unknown
Tier 3 · 17–32board 6OK0.5 s agoYes
Tier 4 · 1–32boards 7, 8OK0.4 s agoYes
Technical details
Connection epoch
41
Last sequence, board 5
71 208 · 09:41:07
Last sequence, other boards
90 110 – 90 117

Check sensors again

Board 5 · tier 3, bays 1–16 · nothing lights

Bay light test

Bay idSR-02-T3-L05
Colour

Blinks for 3 s · tell people at SR-02 first

Controller link

Response time
26ms
median of the last 60 reads
Reads per second
18
7 of 8 bay boards answering
Waiting to send
0
nothing waiting
Last full read
0.4s
partial · board 5 skipped
Technical details for IT
Model
HF-XGate2-P4 · serial 0410-202506-001-0202
Address
192.168.0.22:502 · switch port P2
Firmware
V2.01-2503 · reported by the controller 06:02
Boards
8 bay boards + tower board 9 · left tower out 1 · right tower out 2
Profile
janus.light-grid.xgate-tera-input.v1
  1. 14:30
    Wiring version 4 drafted · board 10 → tier 3, bays 1–16
    Dávid Horváth · permit PMT-260924-01 · waiting for a site administrator to apply
  2. 14:30
    Bay check through board 10 · T3-L07 lit blue
    Seen by Dávid Horváth on his phone · permit PMT-260924-01
  3. 14:27
    Board 5 asked again · no answer
    Dávid Horváth · permit PMT-260924-01
  4. 14:26
    Permit granted · Dávid Horváth · tier 3, bays 1–16 until 18:00
    Bence Tóth · fault owner · PMT-260924-01
  5. 14:25
    Sensor check · no answer · board 5
    Eszter Szabó · 3 attempts · bays stay Unknown
  6. 14:20
    Board 10 answered · serves no tier
    Controller · spare board fitted by Dávid Horváth at 14:18
  7. 11:10
    Board 5 read less often
    Janus · automatic after 20 missed answers in a row
  8. 09:41
    Left tower yellow
    Janus · tier 3 unknown · right tower stays off
  9. 09:41
    Fault · sensors stopped · tier 3 · 1–16
    Janus · board 5 · no answer · still open · R-2026-0131 at T3-L07 unknown until the sensors report
  10. 06:02
    Controller online
    Janus · after planned restart

Controller maintenance

  • Update firmware
    V2.02-2510 is available from Danutek (released Mon 15 Sep). SR-02 is Limited for about 15 min while the vendor tool runs, then Janus checks it answers and records both versions.
  • Replace the controller
    A new box takes over CTRL-B01: its name, address, wiring and every bay record. Nothing about the bays or reels changes.

Pause CTRL-B01 for a vendor tool

Janus releases the controller so a vendor tool can connect to it. Every bay on SR-02 shows Unknown until you reconnect. This is not electrical isolation.

Place

About place

Where the rack stands. It changes only through Move; bays and reels keep their records.

Where
SMT hall › SMT Line 2 · position 2
Floor label
POS-L2-02 · on the floor in front of the rack
Rack labels
RACK-SR-02 · one on each end
Home station
None · operators switch to it by scanning RACK-SR-02
Switch port
P2 · seen 06:02

Re-files POS-L2-02; nothing moves. From the site’s areas and lines.

Place history · 2at SMT Line 2 · position 2 since Mon 1 Sep
  • SMT Line 2 · position 2
    since Mon 1 Sep · Moved by Dávid Horváth · confirmed by Eszter Szabó
    EV-0612
  • Store A · position 4
    Mon 25 Aug – Mon 1 Sep · Set up there by Dávid Horváth

Setup

  1. IdentifyMon 25 Aug (done)
  2. NameSR-02 (done)
  3. Where it isStore A · position 4 (done)
  4. Address192.168.0.22 (done)
  5. Shape4 × 32 (done)
  6. Check it answersPassed (done)
  7. Add to serviceMon 25 Aug (done)

Added to service by Dávid Horváth on Mon 25 Aug.

Storage and shape

About storage and shape

Bay widths and names change in Layout.

Holds
Reels
Shape
One side · 4 tiers × 32 bays · no double-height tiers
Bays
128 × 7″ · 2 boards of 16 per tier
Tower lights
2 · left end and right end, each set on its own
Names
SR-02-T{tier}-L{bay}

Rack behaviour

About rack behaviour

Written to the controller. Sensor timing for all racks is in Site rules.

%

Saved: 80 %

ms

Saved: 1000 ms

1 change in draft · bay light brightness 80 % → 60 %

Review rack settings change

SR-02 only. Written to CTRL-B01 when you apply.

Bay light brightness
was 80 %now 60 %
If someone else applies a change first, yours is not applied and this draft is kept.
Versions · 13in use since Mon 22 Sep
  1. v13Eszter Szabó · Mon 22 Sep 09:10 · 1 changeIn useSee changes
  2. v12Gábor Szabó · Thu 18 Sep 15:40 · 1 changeSee changes
  3. v11Dávid Horváth · Mon 25 Aug · added to serviceSee changes

How often Janus reads each board

About how often janus reads each board

Set by Janus. A board with no answer is read less often.

SR-02 read pace per board
BoardReadsPaceActualWhy
boards 1, 2Tier 1Normal400 ms—
boards 3, 4Tier 2Normal410 ms—
board 5Tier 3 · 1–16Slow · no answerNo answerNo answer since 09:41
board 6Tier 3 · 17–32Normal420 ms—
boards 7, 8Tier 4Normal410 ms—

Retire this rack

About retire this rack

Empty it, switch it off, then retire it.

  1. Check2 things block this
  2. Emptying
  3. Switched off
  4. Retired
  • Blocks86 reels must be moved out first
  • BlocksTier 3, bays 1–16 are Unknown: empty can’t be confirmed

Retired racks keep their history; their bays are closed and can't be reopened. To use the rack again, set it up again.

Starting stops new put-ins on SR-02. It can be continued from any station.

Not available until the blockers are cleared.

In service

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

SR-02-T3-L07

Tier 3 · bay 7 · 7″

Record

R-2026-0131
PN-QFN32-MCU7 · MCU 120 MHz · MSL 3
310pcs

Sensor

Unknown

last good reading 09:41 · reel then

Unknown · sensors not reporting since 09:41. Never lit, never read as empty. A reel on record here can still be taken out on screen guidance and a scan: Pending confirmation until board 5 reads the bay again. Put-ins go to bays that report.
Open R-2026-0131
Holds
Reels up to 7″
Bay light
Off while the sensors are unknown
Wired to
bus 1 · board 5 · ch 7

Let someone work on this fault

SR-02 · board 5 silent since 09:41 · tier 3, bays 1–16 Unknown

Bays
T4T3T2T1

Ends earlier when the fault closes.

May
Ask boards again · light and check bays · read sensors · draft wiring
Stays with
A site administrator: applying wiring and everything else on SR-02

Then: choose a person to see what they can do.

Pause controller CTRL-B01?

Janus finishes sending, then releases the controller. SR-02 stops lighting bays and all 128 bays show Unknown until you reconnect. The pause survives a restart.

For example: vendor check of a board with the XGate tool.

Write at least 4 characters.

Update firmware · CTRL-B01

SR-02 · High-capacity rack B

  1. Plan
  2. Released
  3. Vendor tool
  4. Back online
  5. Recorded
Now
V2.01-2503 · reported by the controller 06:02
New
V2.02-2510 · Danutek release of Mon 15 Sep · file checked
Who
You · or an installer under a permit for a firmware update
If it fails
The rack stays Limited and the receipt says which check failed. Going back needs the vendor tool; Janus records whichever version the controller reports.

Then: SR-02 becomes Limited while the vendor tool runs. Janus releases CTRL-B01; all 128 bays show Unknown and no light is set. Offline is expected until 14:47, so no offline alarm. When it answers again Janus reads the version, runs Check it answers and compares the wiring, then records both versions.

Replace CTRL-B01

SR-02 · serial …0202 · 192.168.0.22

The new controller
The rack in front of you should light.
Address

Then: …0418 takes over as CTRL-B01 for SR-02: its name, the address 192.168.0.22, the wiring, the tower rules and all 128 bay records. Serial …0202 is retired and can’t answer as SR-02 again. SR-02 is Limited until every bay is read back.

Move SR-02

Now at SMT Line 2 · position 2 · floor label POS-L2-02

Before it moves

  • NoteTier 3, bays 1–16 are Unknown · the read-back can’t check them
  • NotePermit PMT-260924-01 · Dávid Horváth · stays; its bays move with the rack
  • OKNo put-in or take-out running

Scan the label on the floor, or choose the place.

No offline alarm in this time. Longer, and it becomes a fault with you as owner.

Then: choose the new place and a reason.

Prototype

Overview · SR-02

Preview statePermit granted

Simulate

View as

This page

Purpose
One rack: overview, troubleshoot, settings.
Release
R1
First viewport
1 primary · 1 notice · 3 blocks