:00Thu 24 Sep
Rack setup
1 reply blocked
Before you power on2 of 8 checked by Janus · 6 at the rack
- Your accessValid · checked by JanusDanutek technician account · service visit until Sun 28 Sep 18:00. A setup left paused then passes to Eszter Szabó, who sponsors the visit.
- Rack portRequirements met · read from the hostRack port 1 is en5 on janus-smt-line2, set up by the Janus Service CLI. Janus reads its checks; it never changes them.
- ControllerAt the rackCable it to the rack switch, a free port P9–P23. Power one new controller at a time: each one arrives on 192.168.0.10.
- Your laptop and phonePhone paired · 14:19On the office network or Line 2 Wi-Fi, never the rack switch: the rack network doesn’t serve Janus. Open https://janus-smt-line2.local:8443.
Pair another phone
Scan with the phone camera. Questions only a person at the rack can answer go to it. - The rackAt the rackEmpty or already full: nothing needs clearing. The baseline reads what is in it, and each reel is scanned in after the rack is in service. Keep the firmware as delivered; a change stops Put in service.
- Someone at the rackAt the rackFollow the light needs a named person there: they put a reel where each bay lights and look at the tower.
- Floor labelAt the rackThe position has a floor label, e.g. POS-L2-03. Where it is is set by scanning it. Missing labels print from Label printer SMT-2.
- Which way roundAt the rackT4T3T2T1T4T3T2T1Side A faces the aisle. Tier 1 is at the bottom. Bay 1 is at the left as you face each side.
This reply can’t be set up
Its serial already belongs to CTRL-B01, the controller of SR-02. SR-02 was not changed.
- HF-XGate2-P4192.168.0.10 · factory default
Technical details
- Serial
- 0410-202506-001-0202
- MAC
- C0:D3:91:F0:B2:10
- Port
- 502
What it usually is
- A replacement box with CTRL-B01’s settings copied onto it. The real CTRL-B01 still answers at 192.168.0.22.
- A spare taken from SR-02 and put back on the bench.
Identify this reply. If the rack in front of you lights and SR-02 does not, the reply is a copy.
Replacing SR-02’s controller? The new box takes over from SR-02’s page, with its own serial. A copied serial can’t take over.
As an installer you need a permit for the job on SR-02. It goes to Bence Tóth, the fault owner on shift.