:00Thu 24 Sep

SR-04 · Line-side rack D

Being set up · controller …0311 SMT hall › SMT Line 2 · position 3 · planned

Technical details
Shape
2 sides × 4 tiers × 16 bays · tier 4 double height
Controller
…0311
Address
192.168.0.10
Floor label
POS-L2-03
Not in service · can’t be a working rack yet

Wiring map

…0311HF-XGate2-P4192.168.0.10
Built
2 sides × 4 × 16
Boards
8 bay boards · 4 per side + tower board 9
Towers
Side A · side B · on board 9
Bus 1
Checked in setup

Side A

Board 4A-T4
Bays 1–16
double height
Board 3A-T3
Bays 1–16
Board 2A-T2
Bays 1–16
Board 1A-T1
Bays 1–16
Board 9Side A towerout 1 · off

Side B

Board 8B-T4
Bays 1–16
double height
Board 7B-T3
Bays 1–16
Board 6B-T2
Bays 1–16
Board 5B-T1
Bays 1–16
Board 9Side B towerout 2 · off
  • Planned in setup · not checked yet
  • Double-height tier

Tiers, boards and towers

SR-04 tiers and boards per side
TierSide ASide BBays per sideHeight
T4Bus 1 · 4Bus 1 · 816Double
T3Bus 1 · 3Bus 1 · 716Single
T2Bus 1 · 2Bus 1 · 616Single
T1Bus 1 · 1Bus 1 · 516Single
TowersBus 1 · 9 out 1Bus 1 · 9 out 2——
  1. 14:24
    Wiring planned · 8 bay boards + tower board 9
    Dávid Horváth · Rack setup · not checked yet

In setup SR-04 wiring comes from Rack setup
Not in service yet · Dávid Horváth · next step Address

Alerts

Faults and blocked work stay here until fixed. Notices can be cleared.

SR-02 is limited

Bence Tóth is on itsince 09:41 · 4 h 51 min14:30 installation map v4 drafted by Dávid Horváth under permit · waiting to be applied

Tier 3, bays 1–16 are Unknown. Blocks 2 take-outs for WO-260714-09 and hides 310 pcs of PN-QFN32-MCU7. The rest of SR-02 works.

Troubleshoot SR-02Stays until fixed

Label not recognised

A Würth Elektronik label matched no code rule.

Put-in not finished

Reel R-2026-0109 is waiting for the sensor at SR-01-T4-L31: finish putting it in, or cancel.

Counter ReelSave is failing

Owner: line counter vendorsince 13:48

12 messages waiting. SMT Line 2 counters don't know about reels taken out since 13:48.

Snapshot taken · 14:30

Verified · off-host copy 14:30. Snapshots every 15 min while Janus is busy.

Choose working rack

Scans and bay lights on this station use the working rack. Opening another rack never switches it.

Racks

Help

What the words mean

Language

Applies to this station only. Records keep the words they were written in.

Prototype

Wiring · SR-04

Preview stateSite administrator

View as

This page

Purpose
Boards and channels per tier.
Release
R1
First viewport
1 primary · 1 notice · 3 blocks